Bitumen Emulsion

£400.00

This high-performance Bitumen Emulsion is engineered for cold-applied road construction and maintenance, delivering superior adhesion and rapid setting even in humid or marginal weather conditions.

Competitive Advantage Spotlight
Unlike conventional emulsions, our formulation ensures exceptional coating uniformity and storage stability up to six months, reducing material waste and project delays.

Description

1. Product Overview
Bitumen Emulsion is a liquid dispersion of bitumen in water, stabilized by emulsifying agents for cold-application asphalt technologies. It is primarily used in road construction, pavement maintenance, and surface dressing, enabling superior adhesion and workability without the need for high-temperature heating. The key value proposition lies in its energy-efficient, low-emission application—reducing on-site carbon footprint by up to 60% compared to hot-mix asphalt. Strategically, it is critical for infrastructure projects requiring rapid deployment, extended paving seasons, and compliance with tightening environmental regulations worldwide.


2. Key Specifications & Technical Characteristics

  • Chemical composition: Bitumen (40–70%), water (30–60%), cationic or anionic emulsifiers (0.5–2%), and stabilizers

  • Grade / type: SS-1, SS-1h, MS-2, CSS-1, CSS-1h, RS-1, RS-2, and quick-set / slow-set variants

  • Physical characteristics:

    • Form: Homogeneous liquid

    • Color: Brown to black

    • Particle size: 1–10 microns (mean <5 µm)

    • Density: 1.01–1.05 kg/L @ 25°C

    • Viscosity (Saybolt Furol): 20–100 SFS @ 50°C (grade-dependent)

    • Residue on sieving (850 µm): <0.05%

  • Packaging options: Bulk tanker (20–25 MT), 200 L steel drums, 1,000 L IBC totes, and flexitanks (20 MT per 20 ft container)

  • Shelf life: 6 months in sealed, non-freezing conditions (0–45°C); agitation recommended before use after 3 months


3. Core Industrial Applications

  • Primary industries: Road & highway construction, municipal infrastructure, airport runways, port terminals, and mining access roads

  • Specific operational use cases:

    • Prime coat & tack coat for asphalt layering

    • Slurry seal & microsurfacing for preventive maintenance

    • Cold mix asphalt for pothole repair

    • Fog seal & chip seal for surface rejuvenation

  • Why it performs better than alternatives:

    • Cold application eliminates fuel costs for heating, reducing energy use by ~40–60%

    • Faster setting time (15–60 min depending on grade) minimizes traffic disruption

    • Better adhesion to damp aggregates than hot asphalt, allowing work in humid conditions

    • Lower volatile organic compound (VOC) emissions compared to solvent-based cutback asphalts


4. Competitive Advantages

  • Quality consistency: ISO 9001:2025 certified production with real-time particle size and viscosity monitoring; each batch supplied with Certificate of Analysis (CoA)

  • Supply reliability: Dual-sourced bitumen feedstocks from Middle East and South America; redundant manufacturing lines with 98.5% on-time-in-full (OTIF) performance

  • Logistics capability: Dedicated fleet of heated / insulated tankers; global network of bonded warehouses in Rotterdam, Houston, Singapore, and Jebel Ali

  • Price competitiveness: Long-term crude derivatives hedging enables fixed-price quarterly contracts; volume discounts starting at 500 MT/month

  • Sustainability: Water-based formulation with zero residual solvents; compatible with recycled asphalt pavement (RAP); life-cycle analysis shows 35% lower CO₂ footprint vs. hot-mix

  • Technical support: Free on-site mix design validation; 24/7 application troubleshooting; full documentation (Safety Data Sheet, technical data sheet, application manual)


5. Commercial & Supply Information

  • Minimum Order Quantity (MOQ): 20 MT (one bulk tanker or flexitank)

  • Loading capacity per container / transport mode:

    • 20 ft standard container: 20 MT (flexitank) or 80 drums (16 MT net)

    • Bulk tanker truck: 20–25 MT

    • ISO tank container: 22–24 MT

  • Lead time: 7–15 days FOB from origin; 20–30 days CIF major global ports

  • Incoterms offered: FOB, CFR, CIF, EXW

  • Payment terms: Letter of Credit (L/C) at sight, or 30% deposit + 70% against Bill of Lading for approved buyers

Reviews

There are no reviews yet.

Be the first to review “Bitumen Emulsion”

Your email address will not be published. Required fields are marked *

Add to cart