Showing all 24 results
-

Alkaline Waste Brine
£150.00 -

Argon – By-product
£419.00 -

Boiler Ash Concentrates
£40.00 -

Boiler Mud
£1,000.00 -

Condensate Polishing Sludge
£126.15 -

Cooling Tower Sludge
£300.00 -

Desulfurization Gypsum
£300.00 -

Flue Gas Scrubber Residues
£300.00 -

Industrial Chilled Water Blowdown
£300.00 -

Industrial Heat Transfer Fluid Residue
£600.00 -

Industrial Nitrogen – By-product
£500.00 -

Industrial Oxygen – By-product
£750.00 -

Ion Exchange Waste Streams
£1,000.00 -

Low-Grade Steam Condensate
£30.00 -

Process Water Clarifier Sludge
£50.00 -

Recovered Brine Salts
£1,000.00 -

Recovered Process Water Streams
£238.00 -

Recovered Waste Heat Condensate
£5,333.00 -

Spent Cooling Tower Blowdown
£10,000.00 -

Spent Deionized Water
£600.00 -

Steam Condensate Residues
£200.00 -

Thermal Oil Residue
£500.00 -

Waste Brine Evaporation Residue
£600.00 -

Water Softener Waste
£220.00
